Riverside

Of Vending Machines and Subway Stations

It took longer than expected, but the Riverside Subway station, now known as the (fictional) Tōkyō Metro Kawate station, is done and servicing commuters and schoolkids making their way about Sumida Crossing. Or at least it will once I finish the much-delayed work on the power systems and get the trains running again.
Read More...

Kawate Station

What’s in a name? I needed signs for my subway station, and I knew what form I wanted from some photos I found online (here and here) But these needed to identify the station, the subway line it was on, and the adjacent stations on the line. What line? And what station name? It’s not supposed to be any specific prototype. I’ve been calling this part of the layout the “riverside scene” and using “Riverside Station” informally up to now. And while I could have named it Riverside, that seemed wrong. Japanese signs use a lot of English, but rarely for place names.
Read More...

How I learned to stop worrying and love the BDL168

Well, perhaps that’s a bit strong, but I’m coming to terms with its design flaws and the poor state of the documentation surrounding it and the PM42. I now have the first set of PM42 circuit breakers and BDL168 occupancy detectors (with two sets of RX4 “transponding receivers”) installed, and have done a bit more reading over the weekend. I’ve discovered a few things and come to a few conclusions as a result of that work, and that’s making me feel that I have a handle on this now. But I had to work through a number of issues to get to this point.
Read More...

February 2011 Status - Occupancy Detection Revisited

Work has progressed slowly this month, partly from distractions, and partly because I’ve been reluctant to finish up the block occupancy detector wiring. I finally realized that the reason for this was that I wasn’t happy with my hybrid approach to occupancy detection and transponding.

To recap, my Subway and Commuter loop tracks were to be divided into blocks, with Digitrax BDL168 occupancy detectors and PM42 circuit breakers (circuit breakers are typically one per track per table, whereas there may be two, three or even four detectable track sections on a single track on one table, and more in a couple of cases). The PM42 provides for four circuit breakers, which is a nice fit for the four tracks, and the BDL168 is divided into four independent quadrants (so each can be wired to a separate circuit breaker), each with four block detectors. I’d originally planned one PM42/BDL168 per scene, meaning that wires would have to cross a table boundary in the Urban and Riverside Station scenes.

And that was a problem, for several reasons. First, running wires between tables violates my “keep all wires except bus wires local” design goal (it makes the layout harder to disassemble), second while the BDL168 can support 16 occupancy detectors, in some places I needed more than four on one track, which broke the association of the PM42 circuit breaker element to a single track, meaning a short would shut down a second line. And finally, I wanted to do Transponding, and the BDL168 only supports 8 transponding sensors (using a pair of RX4 sets), meaning some blocks would be able to report which train was in them, and some would only be able to report that some train was present, but not which. None of these were fatal flaws, but they were eating at me. And I finally realized that I only needed two more sets (seven instead of five) to fix these problems.
Read More...

Almost There - January 2011 Status

January went primarily to the backdrops and the risers/inclines of the Riverside Station scene commuter loop, and now the Riverside Station scene begins to come together. The tables themselves are not yet connected to each other or anything else, as I’m taking the opportunity to work on the wiring with them stood on edge, which is much easier than working on it from below.

Read More...

November 2010 Status: Pausing for Thought

After completing the outer loop in September, I took a break from construction. Partly this was because I wanted to run trains, and the next bit of construction I had planned would require disrupting that for a time. Partly it was because I had a number of loose ends I needed to catch up on (chronicled in past musings). And a part of it was an inability to nail down the final design of the Riverside Station track, which was the next thing I needed to work on.
Read More...

June 2010 Status - A Sense of Accomplishment

Well, I have a much greater sense of accomplishment this month than last. June not only saw the subway line completed (in the electrical sense) and operational, it also saw substantial progress on the River Crossing scene. This included finishing the foam shaping for the other side of the river and painting it, as well as building and painting a roof for the subway where it runs through that hillside. There are still retaining walls and roads to build, and some painting, but it looks pretty good “for now” (still with just painted foam for scenery), while I turn my attention to work on the Riverside Station scene.
Read More...

Riverside Station Subway Foam

And finally, work begins on the Riverside Station scene in earnest. The initial focus will be on getting the Rapid/Shinkansen tracks operational. This is the outer loop, that crosses this scene in the front, running above the subway station at the right end of the scene. To do that, foam for the left portion needs to be shaped and painted, which is relatively simple (and was mostly done this weekend, although there’s still a bit of green to be added after some of the primer dries).

The real work will be getting the roof over the subway station built (and putting in the Subway station itself). This hasn’t been done yet, although the plan is final: a strip of foam will form the riverbank, and hold up one edge of a sheet of 0.080” (2mm) styrene that forms the roof of the station as well as the roadbed of the Rapid/Shinkansen tracks. The front edge will be held up by a half-inch strip of 1/8” aluminum supported on wooden posts, just over the cut-out “windows” that provide a view of the subway.
Read More...

Subway First Run

Sunday, 13 June 2010 was an historic day for Sumida Crossing. After the track was all cleaned and re-installed, and the wiring completed, it was time for the trains to take a run. The actual first loop was done by a “maintenance of way” train (actually an old Atlas B23 I was willing to sacrifice if I’d made some horrible wiring error). That done, I broke out the East-i E Inspection Train, and had it take a run to check out the pantograph clearance and general track usability. And I recorded it and made a short video.
Read More...

Subway Track Cleanup, Etc.

This weekend went largely to the beginning of the final (I hope) laying of the subway track, which has been in place, in whole or in part, through more than six months of construction. As a result, it has gotten a bit dirty. All track was pulled up, cleaned with isopropyl alcohol on a cotton pad, and relaid. At the same time, insulated unijoiners (black, in the photo above) were inserted to divide the track into electrical blocks (for power feeds and future occupancy detectors) and power feeds were wired up to terminal strips under the table. I didn’t get it all done, perhaps a bit more than half, but I should be able to finish it during the week and run trains by next weekend.
Read More...

May 2010 Status - Carving Foam

Time marches on, but it seems to be crawling on the banks of the Sumida. The hillside covering the subway has made little apparent progress over the last month, going from squarish blocks of pink foam to carved, but still pink, sections, which only just received a first coat of primer (and have yet to be glued in place).
Read More...

Upper Level Return Tracks

I took a short break from working on the elevated station to assemble the upper level of the unsceniced end, as well as a couple of lower-level (i.e., subway or “water” level) sections of plywood adjacent to and extending the Urban Station and Riverside Station scenes. I also decided how to end the Urban Station scene: on the extension will be a small canal, with the “commercial avenue” continuing over it on a bridge. This is based (very roughly) on the Yoko-jikkengawa river. Read More...