May 2010

May 2010 Status - Carving Foam

Time marches on, but it seems to be crawling on the banks of the Sumida. The hillside covering the subway has made little apparent progress over the last month, going from squarish blocks of pink foam to carved, but still pink, sections, which only just received a first coat of primer (and have yet to be glued in place).
Read More...

Kato Modular Buildings

Today I’ll turn my attention to what goes atop the scenery: buildings. There’s going to be much more on this, and I’ve created a Structures section of the website with its own index page to contain such material, but so far it’s pretty vacant. Today’s post introduces the first page there, describing Kato’s modular multi-story buildings.

Kato makes several modern six-story buildings that are generic enough to use in any city, although they also include signs to decorate them for a Japanese one. But what really makes these buildings special is that they’re modular, and while Kato doesn’t sell the floor units separately, you can combine two or more buildings to make some reasonably tall structures. Read More...

Measure Twice, Cut Once, Get it Wrong Anyway

Some days it doesn’t pay to go into the railroad room. I had spent the weekend carving foam for the hillside that separates the Urban Station scene and the Riverside Station scene from the large river. Just before I was ready to glue it down, I decided to check the clearance of my subway tunnel, and found it seriously wrong. After realizing that my “two-inch” insulation foam was 1.75 inches thick (and I’m sure I measured it before), and raising it up with a chunk of gatorboard (barely visible above, on the left below the pink foam), I still had a bit of a problem. Read More...

Riverbank Scenery and April 2010 Status

April was a fairly busy month. The Urban Station scene received a tram line, and had the viaduct station structure finished. I also built the second level of the unsceniced return curves at the far end of the layout. And then I began working on the other bank of the large river (I’d done the far bank back in February).

I hadn’t done much on the riverbank by the end of the month, although it’s progressed a bit since then. The temporary expressway has been “completed” with the addition of some construction paper guardrails and support beams, as well as being lowered 1.5 cm. I’ve also rough-cut the foam that will go under it, although it needs to be trimmed back a bit, and then shaped to provide a levee up to the level of the bridge crossing the river, with a sloping hillside above it. Read More...